The Public Sector Decarbonisation Scheme is a UK Government initiative aimed at helping public sector organisations reduce their carbon emissions and improve energy efficiency. The scheme was launched to support public sector bodies, including Local Authorities, in implementing energy efficiency measures and low carbon technologies. By investing in energy saving projects, the PSDS aims to contribute to the UK’s commitment to net-zero carbon emissions by 2050 and accelerate the transition to a greener and more sustainable future.
Through the PSDS, eligible public sector organisations can access funding to undertake energy efficiency upgrades, retrofitting existing buildings with energy saving measures, and incorporating renewable energy technologies to reduce their overall carbon footprint.
How Alliance can deliver PSDS projects?
Alliance Leisure can play a vital role in delivering PSDS projects for Local Authorities and other public sector organisations. With expertise in Leisure Developments and experience in working with Local Authorities, Alliance Leisure is well position to implement energy efficient and sustainable solutions that align with the goals of the PSDS.
The process of delivering PSDS projects typically involves the following steps:
Consultation and Assessment
Alliance Leisure will collaborate with the Local Authority to understand their specific energy and sustainability needs. A thorough assessment of the existing facilities will be conducted to identify areas for improvement and potential energy saving measures.
Proposal and Project Planning
Based on the assessment, Alliance Leisure will develop a comprehensive proposal outlining the recommended energy efficiency measures and renewably energy solutions. The proposal will consider factors such as budget, expected energy savings, and the environmental impact.
Funding Applications
Alliance Leisure can assist the Local Authority in navigating the funding application process, ensuring that all necessary paperwork and documentation are in place to secure the funding from the PSDS.
Project Delivery
Once the funding is secured, Alliance Leisure will oversee the project delivery, managing contractors, timelines, and ensuring that all aspects of the energy saving measures are installed according to the plan.
Monitoring and Evaluation
After project completion, Alliance Leisure may provide support in monitoring and evaluating the energy savings achieved, ensuring the expected benefits are realised.
Next steps
Salix have recently announced the launch of Phase 4 of the PSDS with the portal expected to open in October and close on the 25th of November 24. For more information or for any assistance and support with applications for Phase 4, you can get in touch with our team below.
See below for some examples of PSDS project Alliance Leisure have delivered.
Hyndburn Borough Council
Facility: Hyndburn Leisure Centre
Project details: PSDS Phase 1; scope included converting the primary heating system to Air Source Heat Pumps (ASHP), removing all Gas Boilers, with replacement Air Handling Units (AHU) to improve energy efficiency, with installation of LED lighting throughout the facility and Solar PV Panels
Project Value: £2.15m
CO2 Reduction Per Annum: 362 Tonnes
Hambleton District Council (North Yorkshire Council)
Facilities: Bedale Leisure Centre, Northallerton Leisure Centre, Stokesley Leisure Centre
Project details: PSDS Phase 1, multi-site decarbonisation; scope included the conversion of primary heating systems to Air Source Heat Pumps (ASHP), removing all Gas Boilers, plus installation of LED lighting throughout and Solar PV Panels
Combined projects value: £4.8m
CO2 Reduction Per Annum: 560 Tonnes
South Ribble Borough Council
Facilities: Bamber Bridge Leisure Centre, Civic Centre, Leyland Leisure Centre, Penwortham Leisure Centre, South Ribble Tennis Centre
Project details: PSDS Phase 3a, multi-site decarbonisation (live on site); scope includes converting the primary heating systems to Air Source Heat Pumps (ASHP), with installation of LED lighting throughout and Solar PV Panels
Combined projects value: £11m
Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy